General Technical Questionnaire

Please fill in this form according to your requirements and send to us using the field <Send Enquiry> at the bottom of this page.

In addition, we require under all circumstances a diagram or hand drawn drawing showing dimensions, by mail or fax, to permit us to draft a quotation!
Firm:
Responsible person:
Adress:
Telephone:
Telefax:
eMail-address:
 
Name of material to
be conveyed:

Size of granules Bulk density Moisture in % Temperature
Describe material to be conveyed:
Abrasive: No Slightly   Yes   Very 
Corrosive: No Slightly  Yes    Very 
Moist: No  Slightly   Yes    Very 
Sticky: No  Slightly  Yes    Very 
Friable: No  Slightly  Yes    Very 

Indicate the problems to be solved in the required order (1, 2, 3...)

Conveying Discharge Dosing Mixing
Continously
Discontinously

Plant construction in
(PVC, metal, stainless steel, etc.)

Conveying capacity per hour Running time of plant during the day
 m3/hr  hrs/day

Horizontal distance from material receiving point up to material discharge point:  m
Vertical distance from material receiving point up to material discharge point:  m
Total length of the plant:  m
Maximum slope in the plant:  %